After the Growing Dome is built, Insulation Skirt and Door Slabs

Actually, the insulation skirt would have been more effieceintly placed BEFORE the dome was erected, but many things, including the weather, conspired against us in May.  In late May and early June, we placed the Insulation Skirt around the dome in a trench dug by our volunteer excavator, Frank Hagemann.  Justin and Patrick, interns at CRMPI, worked with Michael and Jerome to complete the insulation perimeter and to form and insulate for the door slabs.  TJ Conrete sent a crew over in mid-June to pour the entry slabs, and Louis Meyer brought his backhoe/loader to backfill the perimeter for us.  Thank you, everyone!